Waiting for MVP? You're paying for the wait.

This calculator models a user-set scenario for environment setup, access, and project readiness. Its output is arithmetic, not measured savings or a typical hiring outcome.

How much money burns while you set up env?

Move the sliders to your team. The math is printed below the result.

5
$130,000
2
$25,000 payroll burned on waiting
2 weeks MVP delayed — 0 features shipped
$95/mo same team on TDK instead

Math: user-set developers × (user-set salary ÷ 52) × user-set blocked weeks. This output is arithmetic, not savings. TDK is designed so tdk doctor and tdk up replace a setup wiki; onboarding time has not been measured on a hiring cohort.

The first month, two ways

Same five developers. Same project. Different first month.

Without TDK

Week 1

Five machines, zero running systems

Installs, VPN, credentials. The setup wiki describes a stack that no longer exists.

Week 2

The environment lottery

Two developers run the backend but not the database. One waits on the business analyst for specs. Nobody sees the whole system.

Week 3

First commit, maybe

Half the team can finally run the project. The other half broke their setup trying.

Week 4

Illustrative scenario: a month of payroll, a week of code

The MVP is already a month late and nobody wrote a line of product code in weeks one and two.

With TDK

Day 1, morning

Clone, tdk up, code

All five developers boot the full system — databases, queues, frontends — in minutes.

Day 1, afternoon

First feature branch

Hot reload works, tests run against the live stack, the BA call hasn't even ended.

Week 1

First demo to stakeholders

An illustrative scenario showing what a shorter setup period could mean. TDK onboarding time has not been measured on a hiring cohort.

Week 4

Illustrative scenario: a month of payroll, a month of code

This scenario assumes environment setup took one morning. It is an illustration, not a measured customer result.

Hire one a week — or unblock all five at once

The textbook advice is onboarding developers one per week so each gets attention. Reality hires the whole team on one Monday. TDK makes the realistic way work.

The +1 developer per week ideal

Staggered starts mean every newcomer gets a mentor, a working setup guide and review time. It takes five weeks to staff the team — and assumes someone senior has five free weeks to babysit environments.

The 5-at-once reality, unblocked

Hire all five together. Nobody needs a mentor for setup because there is no setup: the manifest generates every config, the doctor verifies every machine. Senior time stays on architecture, not on .env files.

Stop paying salaries for waiting

Core stays free. TDK is designed so tdk doctor and tdk up replace a setup wiki; onboarding time has not been measured on a hiring cohort.

Start free